The parking lot next to the Fixed Base Operator terminal at Louis Armstrong New Orleans International Airport (MSY) displayed various signs of wear, such as cracking, breakage, raveling, and differential settlement, necessitating upgrades. MDG prepared construction documents to reconstruct the 23,350 SF concrete parking lot, which involved removing failed concrete panels and replacing them with new concrete pavement. The existing parking lot was also expanded by paving the adjacent gravel parking lot.
